MC-Bauchemie’s fast-setting bonded screed binder that turns a damaged industrial floor bay around in a single working day.

BrandMC-BauchemieCategoryIndustrial FlooringFormA fast-setting, chloride-free special cement binder that is gauged on site with 0-8mm screed sand to form a bonded…

What is it?

A fast-setting, chloride-free special cement binder that is gauged on site with 0-8mm screed sand to form a bonded compound screed classified to EN 13813 CT-C50-F7-A9 – essentially a rapid-turnaround replacement for worn or damaged sections of industrial concrete screed.

Where is it used?

Warehouses, factory floors, loading bays, cold stores, workshops, dock ramps and any heavily trafficked industrial slab where the top 25-70mm of screed has worn through, spalled, or needs cutting out and relaying without a multi-week shutdown.

Why use it?

It lets a contractor cut out, relay and hand back a damaged bay inside a single day or a weekend – smoothable in around 4 hours and ready for a resin topcoat in 48 hours – against the one to four weeks a conventional cement screed typically needs before it can be coated and put back into service.

How is it applied?

Mixed in a compulsory or screed mixer with 0-8mm gravelly sand to a damp-earth consistency (roughly 1 part binder to 4 parts sand by weight, water/cement ratio capped at 0.4), laid fresh-in-fresh over a bonding slurry of MC-Floor Screed BS, screeded to height gauges and finished by hand or with a single-disc smoothing machine.

About MC-Bauchemie MC-Floor Screed 25

MC-Floor Screed 25 is the workhorse binder in MC-Bauchemie’s weekend industrial-floor repair system, sitting alongside the MC-Floor Screed BS bond coat and the self-levelling MC-Floor Screed 10 topping. Where Screed 10 is built for thin, self-flowing overlays of 10-30mm, Screed 25 is the trowel-and-screed-applied member of the family, designed to be gauged with ordinary 0-8mm building sand and hand- or machine-finished into layers from 25mm up to about 70mm in a single pass. That makes it the product a site team reaches for when a genuine chunk of an industrial floor – not just its surface – has broken up: spalled dock aprons, screed that has delaminated around embedded rails or foundations, or bays gouged out by years of forklift and pallet-truck traffic. For Indian factories and warehouses, where a production line standing idle costs far more than the material itself, the appeal is less about the chemistry and more about the calendar: cut, prime, relay and reopen the bay before the next shift.

Underneath that promise is a genuinely fast-reacting special cement, low in chromate and free of chlorides, so it is safe to place directly against reinforcement and doesn’t carry the handling cautions of older rapid-set systems. Mixed to the earth-damp consistency called for in the datasheet, it develops compressive strength past 36 N/mm² within 72 hours and beyond 55 N/mm² at 28 days, with flexural strength climbing past 7 N/mm² over the same period – comfortably inside the CT-C50-F7-A9 bracket of EN 13813, the European standard specifiers use to classify bonded cement screeds. Shrinkage is held to a modest 0.11mm/m at 28 days, which matters more than it sounds: a screed that shrinks unevenly against an old substrate is a screed that debonds or cracks along the repair line within a season, undoing the whole point of a fast repair.

The technical insight

The speed comes from cement chemistry, not from added accelerators dosed on site – MC-Floor Screed 25 is a factory-blended special binder engineered for rapid early hydration, which is why it can be smoothed in roughly 4 hours yet still needs a full 45-minute-or-so working window to place before that reaction takes hold. The tight water/cement ratio (0.4 maximum) that the datasheet insists on is doing double duty: it’s what gets the mortar to >36 N/mm² by 72 hours, and it’s what keeps residual moisture under the 4 CM% ceiling MC-Bauchemie sets before a resin coating can go over the top at 48 hours. Push more water in for easier troweling and both numbers slip – the floor stays wet longer and the epoxy or PU system applied on schedule is the one that blisters. The system’s other quiet detail is the dedicated MC-Floor Screed BS bond coat: it has to be applied fresh-in-fresh, in a quantity that can be covered within 30 minutes, because the mechanical bond between old and new screed is what the whole rapid-turnaround claim depends on – skip it or let it skin over and you have a fast-setting mortar sitting unbonded on top of the old floor.

Where it is used

  • Rebuilding worn, spalled or delaminated sections of RCC industrial floor slabs in factories and warehouses
  • Fast-track weekend repair of forklift and pallet-truck traffic lanes without stopping production for a full shutdown
  • Reinstating screed after floor-mounted machinery, racking or foundations are removed or relocated
  • Levelling and building up worn or low areas ahead of epoxy or PU resin flooring systems
  • Rapid screed repair in cold-storage and food-processing units where downtime windows are short
  • Screed laid on a separating/isolation layer where the existing base cannot be bonded to directly
  • Loading bay aprons and dock-leveller approach ramps subject to constant wheel traffic
  • Localised patch repair of impact-damaged or chemically attacked industrial floor areas

Key advantages

  • Smoothable in around 4 hours, so trades can walk the bay and keep working the same day
  • Overcoatable with resin flooring systems in 48 hours against weeks for a conventional screed
  • High early and late strength (>36 N/mm² at 72h, >55 N/mm² at 28d) suited to forklift-trafficked floors
  • Low shrinkage (0.11mm/m at 28 days) reduces the cracking and debonding risk that plagues fast repairs
  • Chloride-free, low-chromate formulation (GISCODE ZP1) is safer to handle and place near reinforcement
  • Verifiable EN 13813 CT-C50-F7-A9 classification gives consultants a standard to specify and check against
  • A matched system – dedicated MC-Floor Screed BS bond coat removes the guesswork of picking a compatible primer
  • Backed by MC-Bauchemie’s technical documentation and Space Arc’s on-ground application experience in NCR

Limitations & considerations

  • Minimum layer thickness of 25mm rules it out for thin overlays or feather-edge repairs – use MC-Floor Screed 10 for 10-30mm work instead
  • A working time of only about 45 minutes at 20°C demands a trained crew and mechanical mixing on site; this is not a DIY patching compound
  • Depends on correct substrate preparation and the matching MC-Floor Screed BS bond coat for adhesion – it is not designed to be used standalone
  • Needs curing protection (waterproof sheeting for the first 12 hours) – hot, windy Indian sites in summer need real curing discipline or the fast-set advantage is lost to premature drying
  • A specialty imported binder priced above ordinary PCC or screed repair mortar, best justified where the cost of downtime outweighs the material premium
  • As a distributor-stocked specialty cement, pack availability and lead time should be confirmed before locking in a weekend shutdown window

Selection & best practice

Prepare the substrate by cutting back to sound concrete and mechanically roughening (shotblast or grind) rather than just chipping – MC-Floor Screed 25’s bond strength is only as good as the surface MC-Floor Screed BS is keyed into. Batch strictly to the datasheet’s example formulation (roughly 60kg binder to 240kg of 0-8mm gravelly sand and around 24 litres of water, adjusted down for aggregate moisture) in a compulsory or screed mixer, never by hand, and only mix what the crew can lay within the working window before the mortar starts to set. Apply the MC-Floor Screed BS bond coat in patches no larger than can be overcoated fresh-in-fresh within 30 minutes, and avoid puddling it. Once screeded and smoothed, cover immediately with waterproof sheeting for at least 12 hours, especially on exposed or sun-facing bays – premature drying in Indian ambient conditions is the single most common cause of shrinkage cracking in fast-track screeds. Before coating, confirm residual moisture is at or below 4 CM% and mechanically prepare the surface (shotblast or diamond-grind) rather than coating over a smooth trowelled finish.

Specifications

Layer thickness ≥ 25 mm (typically 25-70 mm in a single lift)
Compressive strength > 36 N/mm² at 72h; > 55 N/mm² at 28 days
Flexural strength > 5 N/mm² at 72h; > 7 N/mm² at 28 days
Classification EN 13813 CT-C50-F7-A9 bonded screed
Smoothable after approx. 4 hours
Overcoatable with resin systems after 48 hours (residual moisture ≤ 4 CM%)
Consumption ~4.2 kg/m² binder + ~16.8 kg/m² sand (0-8mm), per cm of screed thickness
Shrinkage 0.11 mm/m at 28 days
Pack size 20 kg sack (pallet of 35 bags = 700 kg)

Industry use cases

Automotive component plant, NCR

A forklift aisle worn through to exposed aggregate was cut out on a Friday evening, primed and relaid with MC-Floor Screed 25 over the weekend, and back under wheel traffic for the Monday shift.

Cold storage facility

Spalled dock-floor sections were patched ahead of a resin recoat, with the 48-hour overcoating window keeping chiller downtime to a single weekend rather than a full week.

3PL / logistics warehouse

Screed was reinstated after floor-mounted racking anchors were removed and relocated, matching the surrounding floor level without disrupting adjacent aisles still in use.

Food-processing unit

Rapid screed repair ahead of a hygienic epoxy topcoat let the plant meet a tight audit-driven turnaround without extending a planned shutdown.

Multi-bay industrial building, Delhi NCR

Localised screed patches were carried out bay by bay ahead of a phased epoxy flooring rollout, so production continued in unaffected sections of the same floor plate.

Frequently asked questions

How thick can MC-Floor Screed 25 be laid in one pass?
From a minimum of 25mm up to about 70mm in a single lift. For thinner repairs down to 10mm, MC-Bauchemie’s self-levelling MC-Floor Screed 10 is the correct product instead.
Can the floor really be walked on the same day?
Yes – the datasheet rates it smoothable around 4 hours after laying at 20°C, and it can typically take light foot traffic soon after. Full trafficability and coating still follow the 48-hour and strength-development timelines.
Do we need a special primer, or can we lay it straight onto old concrete?
You need MC-Floor Screed BS, the matched bond coat, applied fresh-in-fresh in patches small enough to be covered with screed within 30 minutes. Laying Screed 25 without it risks poor adhesion to the old substrate.
What sand should we use to gauge it?
A locally sourced 0-8mm gravelly sand to a grading curve equivalent to A/B8 (DIN 1045-2), mixed to a damp-earth consistency at roughly 1 part binder to 4 parts sand by weight.
How soon can we run epoxy or PU flooring over a repaired bay?
48 hours, provided residual moisture has dropped to 4 CM% or below and the surface has been mechanically prepared (shotblasted or diamond-ground) rather than coated over the trowelled finish.
What’s the difference between MC-Floor Screed 10 and MC-Floor Screed 25?
Screed 10 is a self-levelling, pumpable topping for 10-30mm overlays. Screed 25 is trowel- and screed-applied, mixed with sand on site, and built for deeper structural rehabilitation from 25mm up to 70mm.

How we position MC-Bauchemie MC-Floor Screed 25

MC-Floor Screed 25 is best specified as part of its own system rather than in isolation – always with the MC-Floor Screed BS bond coat, and alongside MC-Floor Screed 10 where a project needs both a thick structural patch and a thinner self-levelling finish in different zones of the same floor. Space Arc stocks and applies the full MC-Floor Screed range together for this reason. Against the wider market, Fosroc’s rapid-strength repair mortars (the Renderoc and Patchroc ranges) cover adjacent ground – fast trafficable strength gain for concrete patch repair – but they are formulated and marketed as structural/vertical repair mortars rather than as a sand-gauged, trowel-applied industrial screed system with a matched bond coat, so there isn’t a like-for-like Fosroc screed product to name here; a specifier choosing between the two is really choosing between a full MC-Bauchemie screed rehabilitation system and a Fosroc structural-repair-plus-separate-flooring-topping approach assembled from different product lines.

Source MC-Bauchemie MC-Floor Screed 25 for your project

Authorised distribution, technical advice & professional application across Delhi NCR and Pan-India.


Scroll to Top