The single-component cementitious grout Space Arc specifies when a crack, cold joint or void needs to be rigidly filled and re-alkalised — not just bridged — even while water is moving through it.

BrandMC-BauchemieCategoryGrouts & AnchorsFormA single-component, chloride-free micro-cement suspension that is mixed with water on site and pumped through packers…

What is it?

A single-component, chloride-free micro-cement suspension that is mixed with water on site and pumped through packers into cracks, cold joints and cavities, where it hardens into a rigid, re-alkalising fill.

Where is it used?

Cracked RCC basements, retaining walls, water tanks, tunnel linings, dams and any concrete or masonry structure where a dormant crack or void needs to be filled rather than merely bridged.

Why use it?

It penetrates fine cracks and cavities under dry, damp or actively water-bearing conditions, gains early strength fast, hardens without shrinkage or expansion, and helps re-passivate carbonated concrete around reinforcement — all from one 20 kg bag.

How is it applied?

Mixed 20:7 (powder:water by mass) in a colloidal high-shear mixer, then injected in two passes (main injection plus re-injection) through MC Hammer Packers or Surfacepackers using a low-pressure single-component injection pump.

About MC-Bauchemie Centricrete HCS

Centricrete HCS is MC-Bauchemie’s single-component, cement-based injection suspension built for one specific job: filling cracks, construction joints and cavities in concrete and masonry so completely that the defect is structurally closed, not just sealed on the surface. Unlike a waterproofing coating or membrane that sits on top of concrete, Centricrete HCS is pumped into the structure itself, through drilled packers, so the grout occupies the actual crack width and cavity volume. It ships as a grey powder in 20 kg bags and is gauged on site with water at a 20:7 (or 20:8) ratio by mass in a high-shear colloidal mixer, which keeps the ultra-fine cement particles suspended and pumpable long enough to reach tight cracks before the mix begins to set. For project sites across Delhi NCR and pan-India, that translates into a product crews reach for on basement rafts, retaining walls, water-retaining structures and tunnel segments where a crack is confirmed to be dormant (non-moving) but is letting water through, and needs a genuinely rigid, load-transferring repair rather than a flexible sealant.

What sets Centricrete HCS apart from a generic OPC grout mixed on site is that MC-Bauchemie has engineered it to stay workable long enough for multi-point packer injection, then develop strength fast — its own EN 196-1 testing shows flexural strength already in the 4.7–5 N/mm² range at 24 hours — while curing with almost no shrinkage or expansion (around 0.1% volumetric change), so it doesn’t open a fresh hairline crack around the very defect it just filled. It’s also chloride-free and carries a re-alkalising action, which matters on carbonation-damaged RCC where the real goal of injection is as much about protecting embedded reinforcement as it is about stopping water. In practice, it’s best understood as the cementitious half of MC-Bauchemie’s injection portfolio: for dormant, water-bearing structural cracks it’s usually the right call, while actively leaking joints with some ongoing movement, or genuinely dynamic and thermal cracks, are better served by PU or epoxy resin injection grades that can flex rather than hold rigid.

The technical insight

The mixing method is not a formality with this product — it’s the whole point. Centricrete HCS is a micro-fine cement suspension, and the manufacturer’s own datasheet is explicit that a colloidal (high-shear) mixer gives the best injectability because it keeps the cement particles deflocculated in suspension rather than letting them clump and settle, which is exactly what would clog a packer mid-injection. MC-Bauchemie even quantifies the trade-off: mixing with a standard four-arm drill paddle at a minimum of 800 rpm still works for cavity injection, but the resulting suspension is measurably less flowable — its own literature attributes this directly to lower mixing energy — than what a colloidal mixer produces, so for genuine crack injection through packers the colloidal mixer isn’t optional. The flow/efflux time of roughly 80–100 seconds (EN 14117, 4.76 mm cone) is the practical number crews should check on site before pumping: if a batch runs thicker than that, it hasn’t been mixed correctly and won’t penetrate a fine crack. On the strength side, a dynamic E-modulus of around 24,000 N/mm² at 28 days confirms this cures into an actual rigid, load-sharing fill approaching the stiffness of the surrounding concrete — which is exactly why it’s specified for structural crack injection and never marketed as a flexible or elastomeric system.

Where it is used

  • Rigid-fill injection of dormant, water-bearing cracks in RCC basements, retaining walls and foundations
  • Filling and reinforcing construction/cold joints where water is tracking through the joint line
  • Grouting voids, cavities and honeycombing in concrete and masonry under dry, damp or water-flow conditions
  • Pre-injection of larger cavities ahead of a full-surface waterproofing injection or tanking programme
  • Crack injection in water-retaining structures — sumps, tanks, STPs and canal linings
  • Structural crack repair in tunnel segments, shafts and underground metro or utility structures
  • Re-alkalising injection around reinforcement in carbonation-affected columns, beams and foundations

Key advantages

  • Single-component — only potable water is added on site, cutting the batching error that comes with multi-part systems
  • Long open/working time gives crews the margin to complete a full main-injection-plus-re-injection cycle through multiple packers without racing the clock
  • Fast early strength (flexural strength already ≈4.7–5 N/mm² at 24 hours per EN 196-1) lets structures return to service sooner
  • Cures with only ≈0.1% volumetric change — effectively shrinkage- and expansion-free, so it doesn’t reopen the crack it just filled
  • Chloride-free and re-alkalising, which helps passivate reinforcement in carbonated concrete rather than just plugging the crack
  • One product handles dry, damp and actively water-bearing cracks, so specifiers don’t need to switch systems for wet sites
  • Backed by an Environmental Product Declaration (EPD), useful where projects are tracking green-building documentation

Limitations & considerations

  • Cures rigid, not elastic — not the right choice for cracks with ongoing structural movement, vibration or thermal cycling; a PU or flexible resin injection belongs there instead
  • Needs a colloidal (high-shear) mixer for full injectability; mixing with a basic drill paddle is usable only for cavity work and gives a visibly less flowable, less penetrating suspension
  • Application depends on a proper injection pump and packers (the manufacturer specifies its own low-pressure single-component pump with Hammer/Surfacepackers) — this is a specialist-crew product, not a pour-and-patch mortar
  • Work must stop once component or substrate temperature drops below 5°C
  • Published only in a 20 kg bag — there’s no small pack for one-off patch jobs, so minimum order quantities matter for small repairs

Selection & best practice

Treat every injection job as an engineered exercise, the way MC-Bauchemie’s own datasheet frames it: survey and map the crack or void first, plan an injection concept (packer spacing, sequence, expected volume), and run a trial injection before committing to the full programme. Mix in a colloidal (high-shear) mixer — add 7–8 litres of water to a clean container, stir in the full 20 kg bag slowly, then time a fast (≥800 rpm) mixing cycle: 3 minutes fast mixing, 2 minutes rest, then a further 1 minute fast mix. Never split a bag; a part-bag mix throws off the 20:7/20:8 ratio the published strength and flow figures are based on. Inject at low pressure through packers such as MC’s own Hammer Packer LP 18 or Surfacepacker LP fittings, and plan for two passes per packer — a main injection followed by a re-injection — rather than treating a single shot as complete. Stop application if component or substrate temperature falls below 5°C, and clean all tools with water within the working time; once the suspension has set, it has to be removed mechanically, not rinsed away.

Specifications

Product Type Single-component cementitious injection suspension (rigid crack & cavity fill)
Mixing Ratio (powder : water) 20 : 7 to 20 : 8 by mass
Density (fresh suspension) ≈1.9 kg/dm³ (DS 18555 T1)
Flexural Strength, EN 196-1 (7 L water) 24h ≈4.9 N/mm² · 7d ≈4.7 N/mm² · 28d ≈7 N/mm²
Dynamic E-Modulus, EN 12390-3 (28d) ≈24,000 N/mm²
Volumetric Change 0.1% (SS 4227 T5) — effectively shrinkage- and expansion-free
Flow / Efflux Time, EN 14117 (4.76 mm cone) ≈80–100 seconds
Colour / Pack Size Grey powder; 20 kg paper bag (yields ≈28 kg / ≈14.7 L slurry)
Shelf Life 12 months in sealed packaging, stored dry between 5–30°C

Industry use cases

Basements & Retaining Structures

Injecting confirmed dormant, water-bearing cracks in basement rafts and retaining walls before the project moves on to surface waterproofing or tanking.

Water & Wastewater Infrastructure

Crack and cold-joint injection in RCC water tanks, STPs and canal linings, where a rigid, re-alkalising fill is preferred over a flexible sealant.

Tunnels & Metro Structures

Pre-injecting cavities and voids in segmental tunnel linings and shafts ahead of a dedicated waterproofing injection stage.

Industrial & Power Plant RCC

Re-alkalising crack injection on carbonation-affected columns and foundations where reinforcement protection matters as much as stopping water.

Heritage & Masonry Structures

Grouting voids behind stone and brick facades where the structure needs consolidation as much as water control.

Frequently asked questions

Is Centricrete HCS the same as an epoxy or PU crack injection resin?
No. It’s a cementitious (cement plus water) suspension, not a resin. It cures rigid and is meant for dormant, structural cracks — for cracks with ongoing movement, or actively pressurised leaks that need a fast-reacting hydrophobic system, a PU or epoxy injection grade is the better fit.
Can it be injected into a crack that’s actively carrying water?
Yes — the manufacturer’s application data specifically covers dry, damp and water-bearing conditions, which is one of the main reasons specifiers pick a cementitious suspension over a plain, non-injectable patch mortar on wet sites.
What mixing equipment does the crew actually need on site?
Ideally a colloidal (high-shear) mixer — that’s what the datasheet recommends for full injectability. A four-arm paddle on a drill at a minimum of 800 rpm can be used for cavity filling, but expect a less flowable, less penetrating mix.
How soon does it gain strength, and when can the next stage of work start?
Flexural strength is already around 4.7–5 N/mm² at 24 hours per the manufacturer’s EN 196-1 testing, climbing to roughly 6.6–7 N/mm² at 28 days — fast enough that most sites can plan follow-on work within a day or two, though the actual go-ahead should follow the project’s own QA sign-off.
What does one bag cover, and is there a smaller pack for small repairs?
A 20 kg bag yields about 28 kg (≈14.7 litres) of injection slurry, and it’s only sold in that size — always mix the whole bag, so plan quantities in 20 kg increments even for small crack-injection jobs.
Will it shrink or crack again after it cures?
It’s engineered to be essentially shrinkage- and expansion-free, with volumetric change measured at just 0.1% — so a correctly executed injection shouldn’t reopen a fresh crack around the fill line.

How we position MC-Bauchemie Centricrete HCS

Within MC-Bauchemie’s own range, Centricrete HCS sits alongside the company’s PU and epoxy resin injection grades — the cementitious choice for dormant, water-bearing structural cracks, while the resin systems take over where a crack is still moving or where a fast-setting, hydrophobic chemistry is needed to chase and stop actively flowing water first. It’s also positioned as the pre-injection step ahead of MC-Bauchemie’s broader waterproofing and tanking systems, closing cavities before a membrane or coating goes on. On site it’s typically specified together with dedicated injection hardware — a low-pressure single-component pump and Hammer or Surfacepacker fittings — rather than treated as a standalone bag-and-trowel material, since the injection method is as much a part of the specification as the grout itself. Where a project genuinely needs the flowing-water performance of a PU chemistry rather than a rigid cementitious fill, Fosroc’s Nitofill PU23 is a credible alternative from a brand Space Arc also carries — it’s built specifically to chase and seal active water leaks in basements and tunnels, though it cures to a rigid foam rather than Centricrete HCS’s re-alkalising cement matrix, so the choice usually comes down to whether reinforcement passivation or fast leak-chasing is the priority on that particular crack.

Preferred brand · Fosroc equivalent

Fosroc Nitofill PU23 — Specifiers dealing with an actively flowing, pressurised water leak rather than a dormant crack sometimes prefer Nitofill PU23’s fast-reacting, water-triggered PU foam over a cementitious fill, accepting that it won’t deliver Centricrete HCS’s re-alkalising benefit for the surrounding reinforcement.

Compare with Fosroc Nitofill PU23 →

Source MC-Bauchemie Centricrete HCS for your project

Authorised distribution, technical advice & professional application across Delhi NCR and Pan-India.