MC-Bauchemie Centrament Retard K 33
A chloride-free retarding plasticizer that buys ready-mix, piling and mass concrete extra working time in India’s heat — without giving up final strength.
What is it?
A liquid, chloride-free set-retarder with plasticizing properties, dosed at 0.2% to 1.0% by weight of cement to delay initial setting and improve workability.
Where is it used?
Ready-mix concrete plants, piling and pre-stressed concrete work, bridge construction and mass concreting on sites across Delhi NCR and pan-India.
Why use it?
Buys extra working time for hot-weather and long-haul concrete, stops cold joints forming between successive batches, and improves 7- and 28-day compressive strength versus a plain mix.
How is it applied?
Dosed into the gauging water or added during batching through a calibrated liquid dispenser, with the exact rate fixed by a site trial using the actual cement, aggregates and temperature.
About MC-Bauchemie Centrament Retard K 33
Delhi NCR’s ready-mix plants lose more concrete to flash-setting than to almost any other single cause in the April-to-June window — a transit mixer stuck for forty minutes at a signal can roll onto site with a load that’s already stiffening in the drum. Centrament Retard K 33 is MC-Bauchemie’s answer to exactly that problem: a chloride-free liquid retarder with built-in plasticizing action that pushes back the initial set of the concrete and keeps it workable long enough to place, compact and finish properly. It’s dosed into the mix at 0.2% to 1.0% by weight of cement — the manufacturer is upfront that the right number depends on your cement, aggregates and site temperature, and needs a trial batch to pin down rather than a number picked off a chart.
Because it carries no chlorides, it’s a safe choice around reinforcement, near prestressing strand, and in RCC generally — unlike older calcium-chloride-based retarders that can accelerate corrosion. It’s supplied as a brownish liquid at roughly 1.15 g/cm³, complies with ASTM C 494, and MC-Bauchemie’s own data sheet notes it improves rather than compromises 7- and 28-day compressive strength once the retarded set finally kicks in. As an authorised MC-Bauchemie distributor and applicator for Delhi NCR and pan-India projects, Space Arc Engineering supplies Centrament Retard K 33 alongside dosing guidance and site trial support, so contractors aren’t left guessing at rates on a live pour.
The technical insight
Retarding admixtures in this class work by interfering with the early hydration chemistry of cement — the active organics adsorb onto the surface of cement grains and slow the formation of the calcium silicate hydrate (C-S-H) gel that’s responsible for the concrete’s initial stiffening, while a secondary dispersing action keeps cement particles from clumping together, which is what gives Centrament Retard K 33 its plasticizing side-effect alongside the pure set-delay. That’s also why MC-Bauchemie’s data sheet is careful to separate “initial retardation” from “normal hardening”: once the delayed window passes, hydration resumes along its normal path, which is consistent with the improved 7- and 28-day strength the manufacturer reports rather than any lasting weakness in the hardened concrete. In practice this mechanism is dose-sensitive and cement-sensitive — different C3A and alkali content across OPC, PPC and PSC sources changes how much delay a given dosage buys — which is precisely why the data sheet frames 0.2-1.0% as a band to be trial-fitted on site rather than a fixed number.
Where it is used
- Ready-mix concrete supplied to sites across Delhi NCR during hot-weather months, where transit time alone can eat most of the normal setting window
- Piling and bored cast-in-situ concrete, where the pour has to stay workable through the full depth and duration of tremie placement
- Pre-stressed concrete work, where a controlled, predictable set is part of the stressing schedule
- Bridge construction — girders, deck segments and other large monolithic pours that need successive batches to set together
- Mass concreting such as raft foundations and thick sections, to reduce the risk of a visible cold-joint line between placement lifts
- Long-distance transport of ready-mix concrete, where extended haul times would otherwise force a mix redesign
- General hot-weather concreting on any site where ambient temperature is accelerating the set faster than the crew can place and compact
- Situations demanding synchronised setting across multiple truck loads landing on the same element
Key advantages
- Chloride-free formulation — safe to use near reinforcement, prestressing steel and in RCC without the corrosion risk of older CaCl2-based retarders
- Complies with ASTM C 494 for chemical admixtures
- Extends the workable window of concrete, which is the main lever for beating hot-weather flash-setting and long RMC transit times
- Prevents cold joints by letting successive batches in a monolithic pour set together instead of at staggered times
- Resists the accelerating effect of high ambient temperature, cutting the risk of thermal-cracking that comes with over-fast set
- Not an air-entraining admixture, so it doesn’t unintentionally change the entrained air content of the mix
- Improves 7- and 28-day compressive strength versus a plain, unadmixed concrete of the same mix design
- Compatible with all standard cement types, including OPC, PPC and PSC, giving RMC plants flexibility across mix designs
Limitations & considerations
- Dosage is a range (0.2% to 1.0% by weight of cement), not a fixed number — it has to be pinned down with a site trial using your actual cement, aggregates and temperature before use on a live pour
- Overdosing risks bleeding, segregation and abnormally extended setting times, so dosing discipline at the batching plant matters more than with a simpler admixture
- It’s a liquid product with a 12-month shelf life that must be stored unopened and protected from rain, direct sunlight, heat and frost — poor site storage will shorten its usable life
- It’s a general-purpose retarding plasticizer, not a high-range water reducer; projects chasing very high water reduction or very high early strength need a dedicated superplasticizer alongside or instead of it
- The published data sheet on file is an older edition (January 2013), so current dosage figures and compliance details should be reconfirmed with MC-Bauchemie or Space Arc before large-scale specification
- Retardation alone doesn’t solve true mass-concrete thermal cracking — it helps avoid cold joints but still needs to be paired with low-heat cement selection and proper curing on very thick pours
Selection & best practice
Never fix a dosage from the data sheet range alone — MC-Bauchemie’s own literature is explicit that 0.2% to 1.0% by weight of cement is a starting band, and the actual optimum has to be established with a trial batch using the real cement, aggregates and site temperature you’ll be working with, not a lab reference mix. Dose it through a calibrated liquid dispenser during batching, or add it to the gauging water, and keep the same dosing discipline across every load so successive batches actually set together — that’s the whole point of using a retarder on a large pour. Watch dosage discipline closely in hot weather: a severe overdose of any retarding plasticizer can cause bleeding, segregation, and setting times that stretch out far longer than planned, while a slight overdose is generally forgiving provided the concrete is properly mixed, placed, compacted and cured. Pair it with a proper curing regime — quick water loss undoes much of the benefit a retarder buys you in workable time — and re-verify dosage whenever the cement source, ambient temperature, or mix design changes materially.
Specifications
| Product Type | Concrete retarder with plasticizing properties (retarding plasticizer) |
| Standard Compliance | ASTM C 494 |
| Chloride Content | Nil (chloride-free) |
| Form / Colour | Liquid, brownish |
| Density (Specific Gravity) | 1.15 ± 0.02 g/cm³ |
| Dosage | 0.2% to 1.0% by weight of cement (optimum fixed by trial) |
| Air Entrainment | None — not an air-entraining admixture |
| Shelf Life | 12 months from date of manufacture, in unopened packaging |
| Pack Sizes | 250 kg drums and 30 kg pails |
Industry use cases
Ready-Mix Concrete (RMC) Plants
Batching plants supplying Delhi NCR sites through the summer use it to hold slump and workability through one to two hours of transit without the load stiffening before the pour.
Piling & Foundation Contractors
Bored cast-in-situ piling concrete stays workable through the full depth and duration of tremie placement, cutting the risk of a cold joint forming partway down a long pile.
Bridge & Pre-stressed Concrete Work
Synchronises the set across successive girder or deck-segment pours so a large monolithic section behaves as one continuous placement rather than a series of staggered ones.
Mass Concrete & Raft Foundations
Slows early stiffening across a large raft pour, giving placing crews more time between lifts and reducing the chance of a visible cold-joint line.
General Hot-Weather Construction
On peak summer days when a mix can start setting inside the transit mixer, it buys the extra 30-90 minutes crews typically need for placing, compaction and finishing.
Frequently asked questions
What dosage of Centrament Retard K 33 should we use?
Will it reduce the final strength of my concrete?
Is it safe to use in reinforced or prestressed concrete?
Can it be used with PPC or PSC, or only OPC?
What happens if the dosage is accidentally too high?
How is it packed and what’s the shelf life?
How we position MC-Bauchemie Centrament Retard K 33
Centrament Retard K 33 sits inside MC-Bauchemie’s Centrament family of ready-mix and site-dosed admixtures, alongside the company’s Muraplast range of higher-range superplasticizers used where water reduction rather than set-delay is the priority — on many Space Arc-supplied projects the two get specified together, a Muraplast product for strength and workability at the mixer and Centrament Retard K 33 to hold that workability through transit and placement. Where a project has already standardised on Fosroc, or a specifier wants a lignosulphonate-based retarding plasticizer with its own documented ASTM/BS compliance for hot-weather ready-mix work, Conplast RP264 is a genuine and credible alternative; the choice usually comes down to which brand the site’s RMC plant already stocks rather than any meaningful performance gap between the two.
Fosroc Conplast RP264 — Specifiers already standardised on Fosroc for a project, or those who specifically want a documented lignosulphonate-based water-reducing retarder for hot-weather ready-mix concreting, will often reach for Conplast RP264 as the equivalent chloride-free option.
Related Concrete Admixtures products
Source MC-Bauchemie Centrament Retard K 33 for your project
Authorised distribution, technical advice & professional application across Delhi NCR and Pan-India.